| Powertron
Teluk Salut Power Station 190 MW Combined Cycle Conversion
Project |
The existing power plant consists of four
frame-6 GE Gas Turbines, which are running on open cycle.
After the conversion the plant will be producing 190MW
from its current 120 MW capacity. Two Blocks of 2-2-1
configuration Combined Cycle Power Plant will be designed
to operate at base load to meet continuous load demand
with ability for cyclic operation. The plant is expected
to support 85% of Sabah's power demand in the future.
Ranhill Engineers & Construction Sdn Bhd, Kualalampur
used its in-house expertise to design and construct the
plant. Proven state-of-the art technology, safety, efficiency,
availability, maintainability, environmental emissions
and economics were the main criteria in the engineering
design and selection of the equipment for the conversion.
The plant's automation shall be such that minimum no.
of operators shall be capable of supervising and controlling
the day to day running of the units from the CCR with
little assistance from local operators.
Ranhill reposed faith on M+P and installed 6 No. high
pressure Ring Section pumps of M+P for supplying feed
water at 135 deg C to boiler for 190 MW Combined Cycle
Power Plant. This prestigious project was awarded to M+P
after stiff competition from reputed global players and
M+P responded by executing the order in record time of
8 months to meet the tight project schedule.
|
|
| |
|